Skip to main content
云境·国际采购平台 | Rental price competition construction refurbishment of the village water supply system to solve the water shortage consumer food, households, class 8 with the installation of the water supply pipeline, PVC blue line through the center 3 inch 8.5 floor, length 3,312.00 meters, mango village, Yangtze district, Lone Province with electronic bidding method (number at project: 69109414830)