Skip to main content
云境·国际采购平台 | The performance of construction-specialized works (the installation of the square piesometers, the tampon of the existing piesometers, the installation of the sealing reperes) on the object: "Mozirskaya TEC. Reconstruction of the shalomovals". Correction. 1 line of construction. SP. Lot 1 construction-specialized works.