Skip to main content
云境·国际采购平台 | Construction and construction work for the project: "Equipment, equipment for material flow measurement, upgrading of existing equipment and systems for measuring Zex, OLA, sulphur production, PVD-1, PVD-2 gas catalytic production, technical re-arming, installation of Zex (2nd stage) ATX-02, EO. PALIAL PAO ANC "Busheft" "Bashneft-Nooyle".